EV Charging Ports
Engineered
0+
- 0+ DC Fast Chargers
- 0+ Level 2 Chargers
Passenger · Fleet · Heavy-Duty Transit · Marine
Every line on this page is a project SLC engineered and signed under a single Engineer of Record. A Sierra casino in 2014 to 20 MW of heavy-duty truck charging in 2025.
Over two decades of licensed engineering across public, utility, commercial, fleet, and EV infrastructure.
EV Charging Ports
Engineered
0+
Passenger · Fleet · Heavy-Duty Transit · Marine
EV Charging Sites
Designed
0+
Designed by SLC as Engineer of Record, with utility coordination and permitting.
Total Site
Construction Value
$0M+
Construction value supported by SLC engineering and permitting.
Principal Engineer
Experience
0+ YRS
Frank Sylvester, P.E., principal-in-charge on every project.
Where SLC Has Worked
Every dot is a project SLC engineered and signed. Filter by service line or hover any marker to see the project, the partners, and the year.
Trusted by Repeat Clients
Multi-project engagements across the portfolio
2025
EV Charging InfrastructureSLC delivered the site civil and electrical plans for one Level 3 DC fast charger at the Kia of Van Nuys dealership.
2025
EV Charging InfrastructureSLC produced the Behind-the-Meter and To-the-Meter design for the installation of a Level 3 charger at Porterville CDJR.
2025
EV Charging InfrastructureSLC served as Engineer of Record on the updated single-line diagram and site plans submitted to PG&E for primary service. The 20 MW connected load supports sixteen or more Megawatt Charging System ports for heavy-duty Class 8 truck charging.
2025
EV Charging Infrastructure (Marine)SLC completed a condition assessment, conceptual site design, and single-line diagram for 300 kVA of EV boat and jet ski charging at the South Lake Tahoe marina.
Location: South Lake Tahoe, CA
Partner: ClearView Electric
2025
EV Charging InfrastructureSLC produced the EV electrical and civil design permit plans for 2.5 MW of fleet charging at the Helios property in South San Francisco.
Location: South San Francisco, CA
2025
EV Charging InfrastructureSLC delivered the Behind-the-Meter and To-the-Meter design for two Level 3 chargers and six Level 2 chargers at Chino Hills Ford.
2025
EV Charging InfrastructureSLC completed a PG&E large load study with site plans and single-line diagram supporting 6 MW of EV charging at the Crest Partners San Francisco property.
Location: San Francisco, CA
2025
EV Charging InfrastructureSLC produced the EV electrical and civil design permit plans for 2.5 MW of fleet charging at the Crest Partners site in San Francisco.
Location: San Francisco, CA
2025
EV Charging InfrastructureSLC delivered the EV electrical and civil design for one Level 3 charger, four Level 2 chargers, and a new electrical service with San Diego Gas & Electric at Jack Powell Dodge in Escondido.
2025
Electrical Distribution DesignSLC produced the electrical site designs and single-line diagrams for multiple PG&E operations yards and service facilities across four Central California cities.
Location: Bakersfield, King City, Los Banos, Morgan Hill, CA
Partner: CLAD Engineering
2025
Electrical Distribution Design
SLC completed a load study analyzing the existing electrical service capacity to support future heat pump installations at The Avalon Lodge in South Lake Tahoe.
Location: South Lake Tahoe, CA
Partner: Clear View Electric
2025
Electrical Distribution DesignSLC designed the customer-owned overhead primary line service and coordinated the PG&E primary service connection for the Aymium facility in Willits.
2024
Battery Storage & Microgrids
SLC provided the electrical design for a whole-home backup system integrating solar generation, a bi-directional EV charger, and a microgrid controller at a private residence in Lincoln.
Location: Private Residence, Lincoln, CA
2024
EV Charging InfrastructureSLC delivered the civil and electrical design for Level 3 chargers and future EV charging stations with full ADA-compliant site design at the Fortress property in San Francisco.
Location: San Francisco, CA
Partners: Power Chord Utility, E2
2024
EV Charging Infrastructure
SLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations at Bravo Ford in Alhambra.
2024
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations at Buena Park GMC.
Location: Buena Park, CA
Partners: Going Green Energy, E2
2024
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations at Huntington Beach Ford.
Location: Huntington Beach, CA
Partners: Going Green Energy, E2
2024
EV Charging Infrastructure
SLC produced the civil and electrical design for Level 2 EV charging stations at the King Auto dealership in Moreno Valley.
Location: Moreno Valley, CA
Partners: Going Green Energy, E2
2024
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations at Hemet Dodge.
2024
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations at Lake Elsinore Dodge.
Location: Lake Elsinore, CA
Partners: Going Green Energy, E2
2024
EV Charging Infrastructure
SLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations at Poway Dodge.
2024
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 EV charging stations with ADA-compliant site design at the Rust-Oleum facility in Riverside.
Location: Riverside, CA
Partners: McKee Electric, Pacific Engineering & Construction
2023
EV Charging + Battery StorageSLC developed a heavy-duty EV truck stop concept supporting Watson Land's warehouse customers, covering site design, layout, cost estimation, grant funding strategy, and total cost of ownership analysis. The concept included photovoltaic canopies and battery energy storage.
2023
Government / Distribution
SLC served as Engineer of Record on a feeder line upgrade at Beale Air Force Base, delivering the electrical and civil engineering for overhead and underground distribution upgrades and repairs.
2023
EV Charging InfrastructureSLC produced the civil and electrical design for Level 3 EV charging stations at Puente Hills Dodge in City of Industry.
Location: City of Industry, CA
Partners: Going Green Energy, E2
2023
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 EV charging stations at Buena Park Chevy.
Location: Buena Park, CA
Partners: Going Green Energy, E2
2023
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations at Long Beach Ford.
Location: Long Beach, CA
Partners: Going Green Energy, E2
2023
EV Charging InfrastructureSLC produced the civil and electrical design for Level 2 and Level 3 EV charging stations with ADA-compliant site design at Theodore Robins Ford in Costa Mesa.
Location: Costa Mesa, CA
Partners: Going Green Energy, E2
2022
EV Charging Infrastructure (Heavy-Duty)SLC delivered the engineering and electrical distribution design for medium-voltage service supporting sixteen 360 kW Level 3 DC fast chargers, totaling 5.8 MW of charging capacity, plus parallel 480 V service for the WattEV truck stop in Bakersfield.
Location: Bakersfield, CA
Partners: Collins Electric, Engineering Partners Inc.
2021
EV Charging + DistributionSLC delivered the electrical distribution design and engineering covering both the To-the-Meter PG&E distribution upgrade and the Behind-the-Meter permit package for 16 to 19.2 kW Level 2 chargers at Mt. Diablo Unified School District.
2021
Government / Distribution
SLC served as Engineer of Record on a feeder line upgrade at Vandenberg Space Force Base, providing the electrical and civil engineering for overhead distribution on concrete poles.
2021
EV Charging Infrastructure (Marine)SLC provided the design and electrical engineering for a DC fast charger installation serving electric boats from a floating pier at Tahoe City Marina.
Location: Tahoe City, CA
Partners: Vita Boats, Aqua Chargers
2021
Electrical Distribution DesignSLC delivered the engineering and design for an overhead pole line replacement built to PG&E standards in Somes Bar for Siskiyou Telephone.
2017
Electrical Distribution DesignSLC served as Engineer of Record on a power and control system upgrade for the Residual Chloramine System chloramine management facility operated by San Jose Water Company.
Location: San Jose, CA
Partner: Industrial Control Systems
2014
Electrical Distribution DesignSLC delivered the electrical design covering power, lighting, and distribution for a new 52-foot box sewer treatment plant and irrigation pump station at Chicken Ranch Casino in Jamestown.
Location: Jamestown, CA
Partners: Gold Electric, Mountaineering Engineering
Footnote
Two additional PG&E engagements are not mapped above because they span dozens of distributed California sites without single coordinates:
Start the Next One
Whether you’re scoping a new installation or working through a complex utility process, SLC is ready to help.
Send the Project Details
Scope, location, timeline. The more detail you provide, the more useful the first response.
SLC reviews every inquiry personally. All project details remain confidential.